BMW 7_aya the E38 series from 1994 to 2002
1. Introduction
2. Governing bodies and methods of operation
3. Settings and routine maintenance of the car
4. Engine
5. Cooling systems of the engine, heating, ventilation and air conditioning
5.1. Engine cooling system
5.2. Systems of heating, ventilation and air conditioning
5.2.1. General information
5.2.2. Removal and installation of a heater
5.2.3. Removal and installation of a radiator of a heater
5.2.4. Removal and installation of fans and resistor assemblies
5.2.5. Removal and installation of the additional water pump and water valve
5.2.6. Removal and installation of deflectors of systems of heating, ventilation and To/in
5.2.7. Removal and installation of the K/V compressor
5.2.8. Removal of other components of the K/V system
6. A power supply system and production of the fulfilled gases
7. Systems of electric equipment of the engine
8. Manual box of gear shifting and coupling
9. Automatic transmission
10. Cardan and power shafts, reducer, differential and stupichny assemblies
11. Brake system
12. Suspension bracket and steering
13. Body
14. Onboard electric equipment
15. Schemes of electric equipment


слух


5-2-4-snyatie-i-ustanovka-ventilyatorov-i-rezistornykh-sborok.html

5.2.4. Removal and installation of fans and resistor assemblies

The fan of the block of the integrated system of heating and To/in

 PERFORMANCE ORDER

  1. Remove facing of the dashboard (see the Head Kuzov).
  1. Unclench a clip of fastening of an air duct.
  1. Cast away latches of fastening of a cover and remove it. You monitor the correct provision of a cover.
  1. Separate the socket, turn out screws and take out the fan.

The fan of the block of the integrated automatic system of heating and To/in

 PERFORMANCE ORDER

  1. Remove facing of the dashboard (see the Head Kuzov).
  2. Unclench a clip of fastening of an air duct (see an illustration).
  1. Unclench the right and left clips of fastening of drafts and levers.
  1. Separate the socket, cut an electrical wiring plait collar, turn out screws and uncover.
  1. Turn out screws (by analogy with an illustration) and take out э / the fan motor.
  2. If necessary remove resistor assembly as it is described below.
  1. Separate the socket and cut an electrical wiring plait collar.
  1. Turn out screws and remove resistor assembly.
  1. Installation is made upside-down.

Fan of a back part of salon

 PERFORMANCE ORDER

  1. Remove a decorative overlay of control levers a heater in a back part of salon, and also the control panel of the fan (see the Head Kuzov).
  1. Turn out on both sides screws and pull out the forward side panel of a tunnel from fastenings.
  1. Turn out screws from the driver.
  1. Unfasten side slips on a back ware box on both sides and pull out them from fastenings back.
  1. Turn out the screws located under slips from the left and right parties.
  1. Through an opening release from clamps behind (1) and in front (2) decorative panel of a back ware box.
  1. Turn out screws (1-3), separate sockets (4 and 5), unblock a contact block (6) and disconnect it.

Do not damage the decorative wooden panel of finishing at removal of the average facing panel. Shift the average panel (7) for small things forward and up and remove it.


  1. Turn out screws and pull out the wooden panel of a ware box (middle part) forward. Separate the socket (1) (under the wooden panel) and pull out the holder (2) sockets of a plait assembled back.
  1. Turn out the screw.
  1. Raise behind a ware box and turn out screws from the left and right side.
  1. Put forward the fan of a back part of salon of the holder (1) forward and take out back up.
  1. Shift rubber caps and separate the socket (1). Turn out screws (2) and take out the fan of a back part of salon.
  1. If necessary separate the socket, turn out screws and remove assembly of resistors.


"previous page
5.2.3. Removal and installation of a radiator of a heater
following page"
5.2.5. Removal and installation of the additional water pump and water valve