5-2-8-snyatie-prochikh-komponentov-sistemy-k-v.html
5.2.8. Removal of other components of the K/V systemEvaporator, locking and safety valves
|
- Remove the block of heating and К/В.
- Remove the broad valve.
|
- Weaken collars from the left and right side and disconnect hoses.
|
|
- Take out from draft fastenings.
|
|
At installation bring both levers into extreme top situation and fix drafts. |
|
- Turn out all screws and wring out all clamps of the lower part of the case. Remove the lower part of the case and take out isparitet.
|
|
- Give cap nuts (1) and remove the locking valve (2).
|
|
At installation replace sealing rings. |
|
- Turn out screws (1) and remove the safety valve (2).
|
|
At installation replace sealing rings. |
- Installation is made upside-down.
|
|
Dehumidifier tank
|
- Discharge the К/В system.
- Remove the right air cleaner.
|
- Turn out bolts, pull out the soaking-up and pressure head pipelines and their zakuporta up if the conditioner remains open more than one hours.
|
|
At installation replace sealing rings. |
|
- Turn out bolts and pull out the dehumidifier tank up.
|
- Installation is made upside-down.
|
|
|
|