BMW 7_aya the E38 series from 1994 to 2002
1. Introduction
2. Governing bodies and methods of operation
3. Settings and routine maintenance of the car
4. Engine
5. Cooling systems of the engine, heating, ventilation and air conditioning
6. A power supply system and production of the fulfilled gases
7. Systems of electric equipment of the engine
8. Manual box of gear shifting and coupling
8.1. Manual box of gear shifting
8.1.1. General information
8.1.2. Removal and RKPP installation
8.1.3. Removal and installation of components of the drive of gear shifting
8.1.4. Capital repairs of the transmission
8.2. Coupling
9. Automatic transmission
10. Cardan and power shafts, reducer, differential and stupichny assemblies
11. Brake system
12. Suspension bracket and steering
13. Body
14. Onboard electric equipment
15. Schemes of electric equipment




8-1-3-snyatie-i-ustanovka-komponentov-privoda-pereklyucheniya-peredach.html

8.1.3. Removal and installation of components of the drive of gear shifting

Components of installation of the drive of gear shifting

1 — the Fork of inclusion of the V transfer and transfer of a backing
2 — Crackers
3 — a hinge Finger
4 — the Fork of inclusion of I and II transfers
5 — the Blocking lever

6 — the Screw of fastening of the blocking lever
7 — an inclusion Fork III and IV transfers
8 — a clamp Cover
9 — Pruzhina of a clamp
10 — a clamp Pin

Components of installation of the drive of gear shifting

11 — the Lock ring
12 — a clamp Cover
13, 15, 27 — Pruzhina of a clamp
14 — the Clamp
16 — the Persistent plate
17, 23 — the Screw
18, 29 — Rollers
19 — the Lever of the choice of transfers

20, 24 — Pruzhina
21 — the Coulisse
25 — the Blocking lever
26 — the Stopper
28 — a clamp Pin
30 — the Rod of the choice of transfers

Gear shifting lever

 PERFORMANCE ORDER

  1. On RKPP GS6-37BZ/DZ (model with the M57TU engine) previously remove system of release of OG and its thermofilter see the Head of the Power supply system and production of the fulfilled gases.
  2. Strong breakthrough remove the gear shifting handle.

Do not turn the handle at removal, otherwise the clamp of angular movements which is in the button will be cut off. At installation put on the handle the lever, level it and to press not it so that it was noticeably latched.

  1. Slightly squeeze a frame of a cover of the lever of gear shifting and take a cover from the central console.
  1. Remove sound insulation.
  1. Remove a clamp (1) and a washer (2). Take out draft (3) drives of gear shifting.

At installation grease a finger of draft of the drive of gear shifting.


  1. Insert the device No. 25 1 110 in the bearing and turn it on a corner 90 ° counterclockwise. Squeeze out bearing inserts from a gear shifting lever core up.
  1. Take a rubber cover from an aperture of a body and take out it together with the gear shifting lever in the direction up.
  2. Installation is made upside-down. Pay attention to the next moments.
  1. Put on an internal rubber cover a switching lever support core cup, and insert an external cover into a body aperture.
  1. Insert a rubber cover an arrow forward if to look in the direction of the movement.
  1. Press bearing inserts, pressing against ledges on a control lever support core until they are not recorded.
  1. Grease a spherical part of the lever of gear shifting, insert the gear shifting lever into a core of a support and level bearing inserts: shooters on the bearing have to be directed parallel to a longitudinal axis of the car, and the ledges holding the bearing - perpendicular to an axis.

Replacement of a holder of a rod of the choice of transfers

 PERFORMANCE ORDER

  1. Disconnect the driveshaft from RKPP (see the Head Kardanny and power shafts, a reducer, differential and stupichny assemblies).
  1. Remove a lock bracket.
  1. Take out draft (1) of the drive of gear shifting from a holder (2) rods of the choice of transfers and remove washers (3).

At installation grease a finger (4) drafts of the drive of gear shifting. The washer (3) has to adjoin to a holder (2) the bigger plane.


  1. Pick up the spring ring (1) established in a flute, and displace it a little back. Squeeze out a cylindrical pin (2) up or down from a holder of a rod of the choice of transfers and remove a holder.

At installation grease a spherical part of a rod and replace a spring ring (1).


  1. Check and if necessary replace a rubber washer (1) in a holder (2) rods of the choice of transfers.
  1. Installation is made upside-down. Pay attention to the next moments.


"previous page
8.1.2. Removal and RKPP installation
following page"
8.1.4. Capital repairs of the transmission