BMW 7_aya the E38 series from 1994 to 2002
1. Introduction
2. Governing bodies and methods of operation
3. Settings and routine maintenance of the car
4. Engine
5. Cooling systems of the engine, heating, ventilation and air conditioning
6. A power supply system and production of the fulfilled gases
6.1. General information and security measures
6.2. Power supply system of petrol engines
6.3. Power supply system of diesel engines
6.3.1. Principles of functioning of control systems of diesel engines
6.3.2. Removal and installation of the case of the air cleaner
6.3.3. Removal and installation of a turbocompressor
6.3.4. Removal and installation of the intercooler
6.3.5. Replacement of the sensor of pressure of pressurization
6.3.6. Removal and installation of the sensor of pressure in the fuel distributive highway
6.3.7. Removal and installation of the regulator of pressure and distributor of fuel
6.3.8. Replacement of the valve of a cut-off of supply of fuel
6.3.9. Removal and installation of fuel lines and fuel distributive highway
6.3.10. Removal and installation of the valve of preliminary heating
6.3.11. Removal and TNVD installation
6.3.12. Removal and installation of nozzles
6.3.13. Replacement of the fuel tank, his jellied mouth, and also fuel pump and sensors of a reserve of fuel
6.4. Systems of release and decrease in toxicity of the fulfilled gases
7. Systems of electric equipment of the engine
8. Manual box of gear shifting and coupling
9. Automatic transmission
10. Cardan and power shafts, reducer, differential and stupichny assemblies
11. Brake system
12. Suspension bracket and steering
13. Body
14. Onboard electric equipment
15. Schemes of electric equipment


https://glamorlady.ru: почему дети такие выносливые


6-3-12-snyatie-i-ustanovka-forsunok.html

6.3.12. Removal and installation of nozzles

After a detachment of pressure head pipelines surely muffle openings in TNVD and nozzles.

Models with the M51 engine

Assembly of a nozzle

1 — the Holder of a nozzle
2 — the nozzle Case
3 — the Bringing opening

4 — the compression Camera
5 — nozzle Eagle
6 — the Returnable fuel-supply line


 PERFORMANCE ORDER

  1. Details of assembly of a nozzle are specified.
  2. Remove the inlet pipeline (see the Head Dvigatel).
  3. Remove the holder of the pipeline and disconnect returnable fuel hoses.

Replace the removed hoses.


  1. By means of a special cutting key give a cap nut of fastening of a tube to the removed nozzle. Close an opening from hit of dirt in it. Weaken a cap nut of fastening of the corresponding tube to TNVD, if necessary keeping from a provorachivaniye for the delivery valve.
  1. Turn out assembly of a nozzle by means of adaptation No. 13 5 320.

To sort a nozzle of the 4th cylinder with the sensor of raising of a needle (wire) it is not allowed.

  1. Installation is made upside-down.

Models with the M57 engine

Close the generator from hit of working liquids on it.


 PERFORMANCE ORDER

  1. Remove the inlet pipeline (see the Head Dvigatel).
  1. By means of a cutting key give cap nuts (1) of fastening of pressure head pipelines (2) on a nozzle (4) and weaken nuts on the fuel distributive highway. Give a nut (3) and remove nozzles.
  1. If the sealing ring (1) did not remain on the removed nozzle (2), take it from a head of cylinders. Pay attention to the provision of a flange (3).
  1. Installation is made upside-down. Before installation clean channels of nozzles. Tighten nuts in the following sequence:
    1. Tighten all cap nuts of pressure head pipelines by hand;
    2. Tighten cap nuts on nozzles with the required effort;
    3. Tighten cap nuts on the distributive highway and on TNVD.
  2. In case of replacement more than two nozzles it is necessary to execute correction of the field of characteristics of nozzles by means of the diagnostic unit.

Models with the M67 engine

The procedure of removal of nozzles on the example of the left number of cylinders is given below (No. No. 5 - 8).


 PERFORMANCE ORDER

  1. Switch off ignition.
  1. Give cap nuts of fastening of pressure head pipelines (3) on a nozzle and on the fuel distributive highway by means of a cap key with a cut.

At the same time hold knot from a provorachivaniye for the union of the pressure head pipeline on a nozzle.

  1. Remove pressure head pipelines.

After a detachment of pressure head pipelines surely muffle openings of injectors and pressure head pipelines.


  1. Wring out the socket (1) down, press a clamp (2) and separate the socket (1).
  1. Turn out bolts of fastening of nozzles, screw special adaptation by means of which remove nozzles instead of bolts.
  1. If the sealing ring (1) did not remain on the removed nozzle (2), take it from a head of cylinders.
  2. Installation is made upside-down. Before installation clean channels of nozzles.
  3. In case of replacement more than three nozzles it is necessary to execute correction of the field of characteristics of nozzles by means of the diagnostic unit.


"previous page
6.3.11. Removal and TNVD installation
following page"
6.3.13. Replacement of the fuel tank, his jellied mouth, and also fuel pump and sensors of a reserve of fuel