BMW 7_aya the E38 series from 1994 to 2002
1. Introduction
2. Governing bodies and methods of operation
3. Settings and routine maintenance of the car
4. Engine
5. Cooling systems of the engine, heating, ventilation and air conditioning
6. A power supply system and production of the fulfilled gases
6.1. General information and security measures
6.2. Power supply system of petrol engines
6.2.1. Principles of functioning of a control system of the petrol engine
6.2.2. Removal and installation of the case of the air cleaner
6.2.3. Removal and installation of a branch pipe between a flowmeter of air and the case of a butterfly valve
6.2.4. Removal and installation of the case of a throttle, replacement of its laying
6.2.5. Removal and installation of the IAC valve
6.2.6. Removal and installation of the fuel distributive highway and injectors
6.2.7. Replacement of the regulator of pressure of fuel
6.2.8. Removal and installation of the fuel pump
6.2.9. Removal and installation of sensors of a reserve of fuel
6.2.10. Removal and installation of the fuel tank
6.2.11. Removal and installation of a fuel jellied mouth
6.3. Power supply system of diesel engines
6.4. Systems of release and decrease in toxicity of the fulfilled gases
7. Systems of electric equipment of the engine
8. Manual box of gear shifting and coupling
9. Automatic transmission
10. Cardan and power shafts, reducer, differential and stupichny assemblies
11. Brake system
12. Suspension bracket and steering
13. Body
14. Onboard electric equipment
15. Schemes of electric equipment


Как опредилить битую машину при покупке


6-2-2-snyatie-i-ustanovka-korpusa-vozdukhoochistitelya.html

6.2.2. Removal and installation of the case of the air cleaner

 PERFORMANCE ORDER

  1. Consider codes of malfunctions and switch off ignition.

M52 engine

 PERFORMANCE ORDER

  1. Weaken a collar (1) and wring out brackets (2). Separate the socket (3).
  1. Turn out bolts (1) and disconnect the rezonatorny camera (2) from a corrugated casing.
  1. Turn out a bolt (1) and remove the air cleaner case together with a corrugated casing.
  1. If necessary wring out brackets (3 and 4) and to disconnect the case of the air filter from an air flowmeter.
  1. Installation is made upside-down. Insert rubber-metal hinges into support. Consider codes of malfunctions and if necessary eliminate them.

M60 and M62 engines

 PERFORMANCE ORDER

  1. Separate the socket (1) of the MAF sensor. Weaken a collar (2) and disconnect a hose. On models with the M62 engine separate the IAT sensor socket.
  1. Wring out brackets (1) and remove an air flowmeter.

At installation replace laying between a flowmeter and the top part of the air filter.


  1. On models with the M60 B30 engine weaken a collar and disconnect a hose.
  1. Turn out the screw and remove assembly of the case of the air cleaner.
  1. Installation is made upside-down.

M73 engine

 PERFORMANCE ORDER

  1. Wring out a clamp (2) and separate the socket (1).
  1. Wring out clamps (1) and weaken a collar (2). Separate the socket (3), weaken a collar (4) and disconnect a hose. Remove the top section of the case of the air cleaner.
  1. Turn out the screw and remove the lower section of the air cleaner.
  1. Installation is made upside-down.


"previous page
6.2.1. Principles of functioning of a control system of the petrol engine
following page"
6.2.3. Removal and installation of a branch pipe between a flowmeter of air and the case of a butterfly valve