BMW 7_aya the E38 series from 1994 to 2002
1. Introduction
2. Governing bodies and methods of operation
3. Settings and routine maintenance of the car
4. Engine
5. Cooling systems of the engine, heating, ventilation and air conditioning
6. A power supply system and production of the fulfilled gases
7. Systems of electric equipment of the engine
8. Manual box of gear shifting and coupling
9. Automatic transmission
9.1. General information
9.2. Search of malfunctions
9.3. Removal and AT installation and hydrotransformer
9.4. Removal and installation of the pallet of a case
9.5. Removal and installation of the PNP sensor
9.6. Removal and installation of the ATF filter and hydraulic block
9.7. Removal and installation Ý/m valves, regulators and sensors
9.8. Replacement of an arm of the mechanism of switching of the AT modes
9.9. Adjustment of the balance weight of switching
9.10. Adjustment of the lever of the selector
9.11. Adjustment and check of blocking of the lever of the selector
10. Cardan and power shafts, reducer, differential and stupichny assemblies
11. Brake system
12. Suspension bracket and steering
13. Body
14. Onboard electric equipment
15. Schemes of electric equipment


Автомобіль Ford Aerostar


9-8-zamena-kronshtejjna-mekhanizma-pereklyucheniya-rezhimov-at.html

9.8. Replacement of an arm of the mechanism of switching of the AT modes

 PERFORMANCE ORDER

  1. Perform the operations described in paragraphs with 4 on 6 Sections Removal and the AT installation and the hydrotransformer.
  2. Remove the selector lever handle, having pulled it with a force up.
  3. Separate the decorative panel of the lever of the AT selector from the central console raise it.
  1. Separate sockets.
  1. Turn out bolts of fastening and remove the PNP sensor.
  1. Turn out bolts of fastening and take the selector lever together with a basic arm, having pulled it up, and then on themselves.
  1. Installation is made upside-down. The pin of the switch has to enter dredging at the selector lever. The rim of rubber consolidation has to adjoin to a mat of the central tunnel.


"previous page
9.7. Removal and installation Ý/m valves, regulators and sensors
following page"
9.9. Adjustment of the balance weight of switching