BMW 7_aya the E38 series from 1994 to 2002
1. Introduction
2. Governing bodies and methods of operation
3. Settings and routine maintenance of the car
4. Engine
4.1. General information and preparatory operations
4.2. Check of compression pressure
4.3. Check of the engine by means of the vacuum gage
4.4. Petrol M60/1 and M60/2 engines
4.4.1. Removal and installation of a cover of a head of cylinders
4.4.2. Removal and installation of a head of cylinders, adjustment of phases GRM
4.4.3. Removal and installation of the top section of the pallet of a case
4.4.4. Removal and installation of the pallet of a case
4.4.5. Removal and installation of covers of a chain of GRM
4.4.6. Replacement of epiploons of a bent shaft
4.4.7. Removal and installation of a flywheel
4.4.8. Removal and installation of belts of the drive of auxiliary units
4.4.9. Removal and installation of a damper of tortional fluctuations and its nave
4.4.10. Removal and installation of the oil pump
4.4.11. Removal and installation of the inlet pipeline
4.4.12. Removal and installation of final collectors
4.4.13. Removal and installation of the engine
4.5. M62 engine
4.6. Diesel M57 engine
4.7. Diesel M67 engine
5. Cooling systems of the engine, heating, ventilation and air conditioning
6. A power supply system and production of the fulfilled gases
7. Systems of electric equipment of the engine
8. Manual box of gear shifting and coupling
9. Automatic transmission
10. Cardan and power shafts, reducer, differential and stupichny assemblies
11. Brake system
12. Suspension bracket and steering
13. Body
14. Onboard electric equipment
15. Schemes of electric equipment




4-4-10-snyatie-i-ustanovka-maslyanogo-nasosa.html

4.4.10. Removal and installation of the oil pump

 PERFORMANCE ORDER

  1. Remove the engine case pallet (see the Section Removal and installation of the pallet of a case).
  1. Remove the protection cover of an asterisk of the oil pump for what, depending on execution, turn out bolts of its fastening, or release a casing from clamps.
  1. Give a nut and remove an asterisk with a chain.
  1. Turn out bolts of fastening of the pump and remove it.
  1. If necessary squeeze a lock cutting ring and take the reducing valve.
  1. Installation is made upside-down. Adjust a chain tension to value A = 10 ± 2 mm, turning a prutkovy key the carving plug in the oil pump.


"previous page
4.4.9. Removal and installation of a damper of tortional fluctuations and its nave
following page"
4.4.11. Removal and installation of the inlet pipeline