4-4-5-snyatie-i-ustanovka-kryshek-cepi-grm.html 
4.4.5. Removal and installation of covers of a chain of GRMLeft cover  
| 
 | 
 
- Uncover the left head of cylinders (see the Section Petrol M60/1 and M60/2 engines).  
 
-  Remove the fan drive coupling with a krylchatka (see the Head of the Cooling system of the engine, heating, ventilation and conditioning). If necessary disconnect tubes of supply of additional air.  
 
-  Disconnect the EVAP valve from the left top cover of a chain of GRM.  
 
 
| 
 | 
-  Remove from a cover of GRM and take aside a positive wire from the rechargeable battery. 
 
 
 | 
 
 
| 
 | 
-  Turn out bolts of fastening and uncover GRM chain. 
 
 
 | 
 
 
-  Installation is made upside-down. Pay attention to position of the aligning plugs, use new laying. When fastening a cover of a chain of GRM at first tighten by hand horizontal bolts, then tighten with the required effort and in two approaches vertical, and only after that finally tighten.  
 
 
 | 
 
 
 | 
 
 
  Right cover  
  
| 
 | 
 
-  Uncover the right head of cylinders (see the Section Petrol M60/1 and M60/2 engines).  
 
-  Remove a plunger of a natyazhitel of a chain and, if necessary, a tube of supply of additional air.  
 
 
| 
 | 
-  Remove the CKP sensor and turn out the top bolt of fastening of a guide of the probe of level of motive oil (see an illustration).  
 
 
 | 
 
 
| 
 | 
-  Turn out bolts of fastening and uncover GRM chain.  
 
 
 | 
 
 
-  Installation is made upside-down. Pay attention to position of the aligning plugs, use new laying and sealing rings. When fastening a cover of a chain of GRM at first tighten by hand horizontal bolts, then tighten with the required effort and in two approaches vertical, and only after that finally tighten. 
 
 
 | 
 
 
 | 
 
 
  Lower cover  
  
  
	
  | 
  
  
  
 
  
	 
	 |