BMW 7_aya the E38 series from 1994 to 2002
1. Introduction
2. Governing bodies and methods of operation
3. Settings and routine maintenance of the car
4. Engine
4.1. General information and preparatory operations
4.2. Check of compression pressure
4.3. Check of the engine by means of the vacuum gage
4.4. Petrol M60/1 and M60/2 engines
4.4.1. Removal and installation of a cover of a head of cylinders
4.4.2. Removal and installation of a head of cylinders, adjustment of phases GRM
4.4.3. Removal and installation of the top section of the pallet of a case
4.4.4. Removal and installation of the pallet of a case
4.4.5. Removal and installation of covers of a chain of GRM
4.4.6. Replacement of epiploons of a bent shaft
4.4.7. Removal and installation of a flywheel
4.4.8. Removal and installation of belts of the drive of auxiliary units
4.4.9. Removal and installation of a damper of tortional fluctuations and its nave
4.4.10. Removal and installation of the oil pump
4.4.11. Removal and installation of the inlet pipeline
4.4.12. Removal and installation of final collectors
4.4.13. Removal and installation of the engine
4.5. M62 engine
4.6. Diesel M57 engine
4.7. Diesel M67 engine
5. Cooling systems of the engine, heating, ventilation and air conditioning
6. A power supply system and production of the fulfilled gases
7. Systems of electric equipment of the engine
8. Manual box of gear shifting and coupling
9. Automatic transmission
10. Cardan and power shafts, reducer, differential and stupichny assemblies
11. Brake system
12. Suspension bracket and steering
13. Body
14. Onboard electric equipment
15. Schemes of electric equipment




4-4-11-snyatie-i-ustanovka-vpusknogo-truboprovoda.html

4.4.11. Removal and installation of the inlet pipeline

 PERFORMANCE ORDER

  1. Disconnect a negative wire from the rechargeable battery.
  2. Disconnect an electrical wiring of the engine from the inlet pipeline and take it aside.
  1. Disconnect a hose of EVAP and cables of control of the gate from a butterfly valve. If necessary remove a butterfly valve in collecting (see the Section Removal and installation of the case of a throttle, replacement of its laying of the Head of the Power supply system and production of the fulfilled gases).
  1. Disconnect hoses of a supply and return of fuel from the fuel distributive highway, remembering an order of their connection and the place of their fastening by collars.
  1. Disconnect the union of the vacuum line from the amplifier of brakes.
  1. Remove a clip and extend PCV tube. Check a condition of a sealing ring of a tube and if necessary replace it.
  1. Give nuts, take prostavochny plugs and remove the inlet pipeline in the direction up.
  1. If necessary uncover (1) with the backpressure valve.
  1. Check a condition of laying and a sealing ring of the valve. If necessary replace them.
  1. Center the inlet pipeline on two prostavochny plugs installed on its left and right sides. Then install the remained plugs and tighten nuts with the required effort.
  2. Further installation is made upside-down.


"previous page
4.4.10. Removal and installation of the oil pump
following page"
4.4.12. Removal and installation of final collectors