BMW 7_aya the E38 series from 1994 to 2002
1. Introduction
2. Governing bodies and methods of operation
3. Settings and routine maintenance of the car
4. Engine
4.1. General information and preparatory operations
4.2. Check of compression pressure
4.3. Check of the engine by means of the vacuum gage
4.4. Petrol M60/1 and M60/2 engines
4.5. M62 engine
4.5.1. Removal and installation of covers of heads of cylinders
4.5.2. Removal and installation of heads of the block of cylinders
4.5.3. Removal and installation of the top section of the pallet of a case and oil pump
4.5.4. Removal and installation of the pallet of a case
4.5.5. Removal and installation of covers of a chain of GRM
4.5.6. Replacement of epiploons of a bent shaft and consolidations of distributors of ignition
4.5.7. Removal and installation of a flywheel
4.5.8. Removal and installation of a damper of tortional fluctuations
4.5.9. Removal and installation of driving belts
4.5.10. Removal and installation of the oil pump
4.5.11. Removal and installation of inlet pipelines
4.5.12. Removal and installation of final collectors
4.5.13. Removal and installation of the engine
4.6. Diesel M57 engine
4.7. Diesel M67 engine
5. Cooling systems of the engine, heating, ventilation and air conditioning
6. A power supply system and production of the fulfilled gases
7. Systems of electric equipment of the engine
8. Manual box of gear shifting and coupling
9. Automatic transmission
10. Cardan and power shafts, reducer, differential and stupichny assemblies
11. Brake system
12. Suspension bracket and steering
13. Body
14. Onboard electric equipment
15. Schemes of electric equipment




4-5-7-snyatie-i-ustanovka-makhovika.html

4.5.7. Removal and installation of a flywheel

 PERFORMANCE ORDER

  1. Remove RKPP together with coupling or AT (see the Head the Manual box of gear shifting and coupling or Automatic transmission).
  2. Record a flywheel by means of special adaptation No. 11 2 070 (see an illustration).
  1. Turn out bolts of fastening of a flywheel, remove the coupling of the hydrotransformer (1) and a flywheel (2).
  1. On a flange of a bent shaft clear carving openings under bolts of fastening of a flywheel.
  1. Installation is made upside-down. The provision of a flywheel is fixed by the special shortened plug. Pay attention that openings in the coupling (1) of the hydrotransformer and in a flywheel (2) have to settle down one above another. Use new bolts of fastening of a flywheel.


"previous page
4.5.6. Replacement of epiploons of a bent shaft and consolidations of distributors of ignition
following page"
4.5.8. Removal and installation of a damper of tortional fluctuations