BMW 7_aya the E38 series from 1994 to 2002
1. Introduction
2. Governing bodies and methods of operation
3. Settings and routine maintenance of the car
4. Engine
4.1. General information and preparatory operations
4.2. Check of compression pressure
4.3. Check of the engine by means of the vacuum gage
4.4. Petrol M60/1 and M60/2 engines
4.5. M62 engine
4.5.1. Removal and installation of covers of heads of cylinders
4.5.2. Removal and installation of heads of the block of cylinders
4.5.3. Removal and installation of the top section of the pallet of a case and oil pump
4.5.4. Removal and installation of the pallet of a case
4.5.5. Removal and installation of covers of a chain of GRM
4.5.6. Replacement of epiploons of a bent shaft and consolidations of distributors of ignition
4.5.7. Removal and installation of a flywheel
4.5.8. Removal and installation of a damper of tortional fluctuations
4.5.9. Removal and installation of driving belts
4.5.10. Removal and installation of the oil pump
4.5.11. Removal and installation of inlet pipelines
4.5.12. Removal and installation of final collectors
4.5.13. Removal and installation of the engine
4.6. Diesel M57 engine
4.7. Diesel M67 engine
5. Cooling systems of the engine, heating, ventilation and air conditioning
6. A power supply system and production of the fulfilled gases
7. Systems of electric equipment of the engine
8. Manual box of gear shifting and coupling
9. Automatic transmission
10. Cardan and power shafts, reducer, differential and stupichny assemblies
11. Brake system
12. Suspension bracket and steering
13. Body
14. Onboard electric equipment
15. Schemes of electric equipment




4-5-6-zamena-salnikov-kolenchatogo-vala-i-uplotnenijj-raspredelitelejj-zazhiganiya.html

4.5.6. Replacement of epiploons of a bent shaft and consolidations of distributors of ignition

Replacement of epiploons of a bent shaft of the M73 engine is made similar to replacement of epiploons of the M60 engine (see the Section Replacement of Epiploons of a Bent Shaft).


 PERFORMANCE ORDER

  1. When replacing consolidation of the case of the right distributor of ignition take out the one-pass valve on the party of cylinders No. No. 1-6.
  2. Remove the air cleaner case (see the Section Removal and installation of the case of the air cleaner of the Head of the Power supply system and production of the fulfilled gases).
  1. Release the protection cover of the distributor of ignition from clamps.
  1. Turn out bolts and uncover the ignition distributor.
  1. Turn out bolts and remove an ignition distributor rotor.
  1. Turn out a bolt and remove a rotor lead.
  1. Turn out bolts and remove the ignition distributor case.
  1. Carefully remove radial ring consolidation, without allowing damage of the interfaced surfaces.
  2. Clear the interfaced surfaces of the case of the distributor and a cover of a chain of GRM, establish new laying by a consolidation strip to the ignition distributor case.
  1. Connect consolidation to adaptation No. 11 3 200 completed with adaptation No. 00 5 500.
  1. Install adaptation No. 11 3 220 on the camshaft and center the case of the distributor of ignition (1) concerning the camshaft by means of adaptation No. 11 3 210.
  1. Further installation is made upside-down. Use new copper washers of bolts of fastening of the case of the distributor of ignition. A lead (1) it is necessary to enter (2) camshafts into dredging.


"previous page
4.5.5. Removal and installation of covers of a chain of GRM
following page"
4.5.7. Removal and installation of a flywheel