BMW 7_aya the E38 series from 1994 to 2002
1. Introduction
2. Governing bodies and methods of operation
3. Settings and routine maintenance of the car
4. Engine
4.1. General information and preparatory operations
4.2. Check of compression pressure
4.3. Check of the engine by means of the vacuum gage
4.4. Petrol M60/1 and M60/2 engines
4.5. M62 engine
4.5.1. Removal and installation of covers of heads of cylinders
4.5.2. Removal and installation of heads of the block of cylinders
4.5.3. Removal and installation of the top section of the pallet of a case and oil pump
4.5.4. Removal and installation of the pallet of a case
4.5.5. Removal and installation of covers of a chain of GRM
4.5.6. Replacement of epiploons of a bent shaft and consolidations of distributors of ignition
4.5.7. Removal and installation of a flywheel
4.5.8. Removal and installation of a damper of tortional fluctuations
4.5.9. Removal and installation of driving belts
4.5.10. Removal and installation of the oil pump
4.5.11. Removal and installation of inlet pipelines
4.5.12. Removal and installation of final collectors
4.5.13. Removal and installation of the engine
4.6. Diesel M57 engine
4.7. Diesel M67 engine
5. Cooling systems of the engine, heating, ventilation and air conditioning
6. A power supply system and production of the fulfilled gases
7. Systems of electric equipment of the engine
8. Manual box of gear shifting and coupling
9. Automatic transmission
10. Cardan and power shafts, reducer, differential and stupichny assemblies
11. Brake system
12. Suspension bracket and steering
13. Body
14. Onboard electric equipment
15. Schemes of electric equipment


Як можна економити на автомобілі


4-5-12-snyatie-i-ustanovka-vypusknykh-kollektorov.html

4.5.12. Removal and installation of final collectors

 PERFORMANCE ORDER

  1. Remove reception pipes and a pipe of supply of additional air (see the Section Removal and installation of the supercharger of air of the SAI system of the Head of the Power supply system and production of the fulfilled gases).

Collectors of the right number of cylinders

 PERFORMANCE ORDER

  1. Give the lower nuts of a final collector of cylinders No. No. 7-9 and remove it.
  1. Remove assembly of the valvate block of a heater from the holder and lay it on a collector (see paragraphs 3 - 5 Sections Removal and installation of a damper of tortional fluctuations and its nave).
  1. Give the top nuts of fastening of a final collector of cylinders No. No. 10-12, remove the thermofilter, give the lower nuts and remove a collector.
  1. Installation is made upside-down. Grease a carving of hairpins with copper paste, use new nuts of fastening of collectors. Establish laying by the smooth party to a head of cylinders.

Collectors of the left number of cylinders

 PERFORMANCE ORDER

  1. Give the lower nuts of a final collector (1) of cylinders No. No. 1-3 and remove it.
  1. Remove the starter thermofilter.
  1. Give the top nuts of fastening of a final collector of cylinders No. No. 4-6, remove the thermofilter, give the lower nuts and remove a collector.
  1. Installation is made upside-down. Grease a carving of hairpins with copper paste, use new nuts of fastening of collectors. Establish laying by the smooth party to a head of cylinders.


"previous page
4.5.11. Removal and installation of inlet pipelines
following page"
4.5.13. Removal and installation of the engine