|
|
4-6-3-snyatie-i-ustanovka-kryshki-privoda-grm.html
4.6.3. Removal and installation of a cover of the GRM drive
|
- Remove the case pallet (see the Section Removal and installation of the top section of the pallet of a case) and temporarily establish a beam of the forward bridge on the former place.
- Remove a head of the block of cylinders (see the Section the Diesel M57 engine).
- Remove the generator (see the Head Sistemy of electric equipment of the engine).
|
- Turn out all bolts on an arm (2) and remove a compressor arm.
|
|
- Remove a hose of the cooling system (1) together with a tank (2).
|
|
- Turn out bolts (1), remove the pump (2) GUR and fix it aside.
|
|
Do not remove servo-driver pipelines. |
|
- Install adaptation No. 11 6 460 on a damper of tortional fluctuations.
|
|
Because of the removed arm of the K/V compressor in points (1) it is necessary to establish the shortened bolts. |
|
- Give a nut (1), turn out bolts (2) fastenings of a natyazhitel (4) and extend a tension arch (3) advance. Remove a natyazhitel.
|
|
At installation new bolts will be required. |
|
- Turn out all bolts of a cover (1) of a chain of GRM and the water pump (2).
|
|
Turn adaptation No. 11 3 340 (3) so that at removal of a cover of a chain of GRM it was not pulled out. Carefully uncover GRM chain. Note the direction of the movement of a chain and remove it. |
|
- Press a level (1) of a natyazhitel in the direction specified by an arrow and remove a natyazhitel of a chain by means of adaptation No. 11 3 340. Remove a level of a natyazhitel from a finger (2) hinges. Turn out a bolt (3) and remove a guide (4) chains in the direction specified by an arrow. Give a nut (5) TNVD.
|
|
- Screw adaptation No. 13 5 191 in an asterisk of TNVD (1). Note the direction of the movement of a chain and screw a bolt of adaptation No. 13 5 191. Remove a TNVD drive asterisk with a driving chain.
|
|
At installation any provision of an asterisk concerning TNVD is allowed. |
|
- Remove laying (1). Check the directing plugs (2) for absence of damage and correctness of installation, if necessary, replace.
|
- Clear the interfaced surfaces, establish new laying.
|
At installation laying has to be dry. |
- Installation is made upside-down. Before installation of a cover of a chain of GRM, it is necessary to establish a chain. The forward epiploon of a bent shaft owing to exact fixing concerning a shaft is replaced only after installation of a head of cylinders and the pallet of a case.
|
|
|
|
|