BMW 7_aya the E38 series from 1994 to 2002
1. Introduction
2. Governing bodies and methods of operation
3. Settings and routine maintenance of the car
4. Engine
4.1. General information and preparatory operations
4.2. Check of compression pressure
4.3. Check of the engine by means of the vacuum gage
4.4. Petrol M60/1 and M60/2 engines
4.5. M62 engine
4.6. Diesel M57 engine
4.6.1. Removal and installation of a head of cylinders, camshafts and their asterisks
4.6.2. Removal and installation of the top section of the pallet of a case
4.6.3. Removal and installation of a cover of the GRM drive
4.6.4. Replacement of epiploons of a bent shaft
4.6.5. Removal and installation of a flywheel
4.6.6. Removal and installation of a damper of tortional fluctuations
4.6.7. Replacement of driving belts and their natyazhitel
4.6.8. Removal and installation of the oil pump
4.6.9. Removal and installation of the oil cooler
4.6.10. Removal and installation of the inlet pipeline
4.6.11. Removal and installation of a final collector
4.6.12. Removal and installation of the vacuum pump
4.6.13. Removal and installation of the engine
4.7. Diesel M67 engine
5. Cooling systems of the engine, heating, ventilation and air conditioning
6. A power supply system and production of the fulfilled gases
7. Systems of electric equipment of the engine
8. Manual box of gear shifting and coupling
9. Automatic transmission
10. Cardan and power shafts, reducer, differential and stupichny assemblies
11. Brake system
12. Suspension bracket and steering
13. Body
14. Onboard electric equipment
15. Schemes of electric equipment




4-6-8-snyatie-i-ustanovka-maslyanogo-nasosa.html

4.6.8. Removal and installation of the oil pump

 PERFORMANCE ORDER

  1. Remove the case pallet (see the Section Removal and installation of the top section of the pallet of a case).
  2. Install on a damper of tortional fluctuations adaptation No. 11 6 460 (see an illustration).
  1. Turn out a bolt (1), remove an asterisk (2) from a shaft of the pump and take from chain links.

At installation it is necessary to be convinced of correctness of provision of a tag of "VORNE/FRONT" (BEFORE) on an asterisk.


  1. Turn out bolts (1) and remove a maslozabornik (3).

At installation use new laying (2).

  1. Turn out bolts of fastening of the oil pump (4) and remove it.
  2. Installation is made upside-down.


"previous page
4.6.7. Replacement of driving belts and their natyazhitel
following page"
4.6.9. Removal and installation of the oil cooler