BMW 7_aya the E38 series from 1994 to 2002
1. Introduction
2. Governing bodies and methods of operation
3. Settings and routine maintenance of the car
4. Engine
4.1. General information and preparatory operations
4.2. Check of compression pressure
4.3. Check of the engine by means of the vacuum gage
4.4. Petrol M60/1 and M60/2 engines
4.5. M62 engine
4.6. Diesel M57 engine
4.7. Diesel M67 engine
4.7.1. Removal and installation of a cover of a head of cylinders
4.7.2. Removal and installation of heads of cylinders
4.7.3. Removal and installation of the top section of the pallet of a case
4.7.4. Removal and installation of the pallet of a case
4.7.5. Replacement of epiploons of a bent shaft
4.7.6. Replacement of an oil separator of the PCV system
4.7.7. Removal and installation of a flywheel
4.7.8. Removal and installation of a damper of tortional fluctuations
4.7.9. Removal and installation of driving belts and their natyazhitel
4.7.10. Removal and installation of the oil pump
4.7.11. Removal and installation of oil coolers
4.7.12. Removal and installation of the inlet pipeline
4.7.13. Removal and installation of final collectors
4.7.14. Removal and installation of the vacuum pump
4.7.15. Removal and installation of the engine
5. Cooling systems of the engine, heating, ventilation and air conditioning
6. A power supply system and production of the fulfilled gases
7. Systems of electric equipment of the engine
8. Manual box of gear shifting and coupling
9. Automatic transmission
10. Cardan and power shafts, reducer, differential and stupichny assemblies
11. Brake system
12. Suspension bracket and steering
13. Body
14. Onboard electric equipment
15. Schemes of electric equipment




4-7-6-zamena-maslootdelitelya-sistemy-pcv.html

4.7.6. Replacement of an oil separator of the PCV system

 PERFORMANCE ORDER

  1. Remove a radiator of the EGR system and the distributor of fuel.
  2. Execute the operations described in sections with 2 on 4 Sections the Diesel M67 engine.
  1. Turn out a bolt (1), give cap nuts (2), pick up the distributive phone (3).
  1. Give cap nuts (1), pick up the distributive phone (2) and disconnect returnable fuel tubes (3). Give cap nuts (4), pick up the distributive phone (5) and the distributor of fuel (6).
  1. Give a cap nut (1) and turn out the distributive pipeline (2) in the direction specified by an arrow.
  1. Cut a collar (1) and remove the holder (2) hoses.
  1. Weaken collars (1) and remove hoses (2).
Collars and hoses.
  1. Release a water hose from a clamp and disconnect it from a cooling system tube.
  1. Turn out bolts (1) and pick up the phone (2) EGR systems. Clear the surfaces interfaced to a tube and replace laying of a tube of EGR.
EGR tube.
  1. Turn out bolts.
  1. Slightly raise a tube (1) of the cooling system and extend it from the case (2) thermostats.

If necessary replace a sealing ring in the thermostat case.


  1. Slightly raise a plait (1) electrical wiring ки and pick up the phone (2) cooling systems.
  1. Give fixture on perimeter an oil separator flange.
  1. Remove the holder of a plait of an electrical wiring from a carving pin.
  1. Open a clamp of a water hose (1), disconnect it and remove an oil separator (2) PCV systems.
  1. Installation is made upside-down. Use new laying, establish them dry on previously cleared interfaced surfaces.


"previous page
4.7.5. Replacement of epiploons of a bent shaft
following page"
4.7.7. Removal and installation of a flywheel